Physical and Environmental Planning Renderings and Maps

 Collection
Identifier: R-002
Abstract

The University of California, Merced campus is the tenth campus in the University of California system. Collection includes graphic representations, maps, and renderings concerning the first phase master planning of campus development.

Dates: 2001 - 2013

Recreation and Wellness (RW)

 Collection
Identifier: RW
Scope and Contents

The Joseph Edward Gallo Recreation and Wellness Center totals 24,985 asf (35,690 gsf). The project includes a gymnasium with bleachers, a student health and wellness center, sports instruction space, cardiovascular/weight training room, locker room, public lobby and reception, and a small administrative office suite.

Dates: 03/22/2013

Samples

 Collection
Identifier: R-005

Science and Engineering 2 (SE2)

 Collection
Identifier: R-040

Science and Engineering (SE)

 Collection
Identifier: SE
Scope and Contents The Science and Engineering Building provides about 110,000 assignable square feet within a total area of 234,000 gross square feet, for research laboratories, laboratory support, teaching laboratories and offices for the natural sciences and engineering divisions. The building also includes administrative office space for the divisional deans. The building consists of two three-story bars organized in plan to form an L shape. A partial basement beneath the intersection of the bars, will...
Dates: Between 2003 and 2006

Sierra Nevada Research Institute (SNRI)

 Collection
Identifier: SNRI
Dates: Other: Date Not Yet Determined

Site and Infrastructure 1 (SI)

 Collection
Identifier: SI
Scope and Contents

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates: Between 2002 and 2006

Site and Infrastructure 2 (SI2)

 Collection
Identifier: SI2
Scope and Contents

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates: December 2006

Site and Infrastructure 4 (SI4)

 Collection
Identifier: R-030
Scope and Contents

Extension of buried Utilities in the Campus Academic Core. Improve Quality of Classroom Space by Installing Audio/Visual and Instructional Tech Equipment. Permanent location for Campus Corporation Yard and Vehicular Access. Permanent Improvements to Ranchers Road. Telecom Building HVAC and Electrical System Improvements. Pump Station Pressure and Filtration Improvements.

Dates: 09/06/2013