Site and Infrastructure 1 (SI)

 Collection
Identifier: SI

Scope and Contents

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

156 Linear Feet

Language of Materials

English

Language of description
Undetermined
Script of description
Code for undetermined script