Skip to main content

Ref ID 1e51334*

 Container

Contains 1 Result:

Kit Fox Bridge with MID Signature Drawings

 Item — Container: Ref ID 1e51334*
Scope and Contents From the Collection:

The project completed key phases of work related to the Section 404 permit conditions including: 1) construction of a dirt perimeter road to improve access to the outer areas of the campus and community; 2) construction of appropriate boundary fencing between the campus and preserve lands; 3) mass grading to improve storm water management; 4) construction of a kit fox bridge; and 5) salvage of impacted wetland soils. ENTIRE CAMPUS

Dates: Summer 2013