4_3_1 Construction Documents
Record Group
Scope and Contents
From the Collection:
The project completed key phases of work related to the Section 404 permit conditions including: 1) construction of a dirt perimeter road to improve access to the outer areas of the campus and community; 2) construction of appropriate boundary fencing between the campus and preserve lands; 3) mass grading to improve storm water management; 4) construction of a kit fox bridge; and 5) salvage of impacted wetland soils. ENTIRE CAMPUS
Dates
- Creation: Summer 2013
Extent
From the Class: 20 Linear Feet
Language of Materials
From the Class: English
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository