Ref ID 535ffcd*
Container
Contains 1 Result:
Campus 2008 Site Development and Infrastructure Design, Bid Package 5, Arup, 2003-02-12
Item — Container: Ref ID 535ffcd*
Scope and Contents
From the Collection:
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates:
2003-02-12