Drawings, Bid Package: D-Site Utilities, ARUP, 2005-03-10

 Item — Container: Ref ID 1ddebdd*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2005-03-10

Extent

69 Sheets ("Site Development and Infrastructure Part 2 - D- Site Utilities") ; 18" x 24"

Language of Materials

From the Record Group: English

Physical Location

Castle Warehouse, Behind Map Case 1

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479