Skip to main content

100%, Civil, ARUP, 2008-02-28

 Item — Container: Ref ID cce8f1f*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2008-02-28

Extent

6 Sheets (Series: Civil (civil notes, legends & abbreviations, rough grading and drainage plan, utility plan, erosion control plan, detail sheet)) ; 18" x 22"

Language of Materials

From the Record Group: English

Physical Location

Castle Warehouse, Behind Map Case 1

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479