Skip to main content

Submittal Schedule

 File — Container: Ref ID 0e894b9*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

2 Volumes (Site-Bid Package 4, Central Plant & Tele Communications - Master Submittal 1 Master Submittal 20040408 1 Master Submittal 20040409)

Language of Materials

From the Record Group: English

Physical Location

Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479