Skip to main content

Sample - Metal Wall Panel

 Item — Container: Ref ID 836bd9e*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

6 Volumes (Submittal Package BP$-07410-004 Metal Wall Panel 2B Finish 1 email correspondence 20040127 1 email correspondence 20040202 with transmittal and change order 1 submittal package and product data packet labelled "Section 07410" 1 submittal transmittal packet (dates 20040122 and 20040115) 1 metal wall panel sample BP4-07410-0004 1 "Potable Pump Station" metal wall panel sample BP3-07410-0002) : Note attached to the Potable Pump Statin (corrugated) piece: "Gene, Please on give me this [arrow pointing left] Thanks [arrow pointing right] Min." The above note explains the somewhat sharp edge on the corrugated metal piece which I covered with removable artist's tape as a safety precaution. Take care when handling.

Language of Materials

From the Record Group: English

Physical Location

Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479