Samples - Metal Louvres

 Item — Container: Ref ID 9ce1999*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

3 Volumes (3 corrugated metal samples for submittal 10210 Bid Package 4 from Swinerton Builders. 1 "C/S A6110" Pewter Finish 1 "C/S A4110" Pewter Finish 1 submittal packet and product info) : Note attached to "C/S A4110": "This is the final chosen color by Jim on 1/14/2004"

Language of Materials

From the Record Group: English

Physical Location

Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository