Skip to main content

Samples - Roofing

 Item — Container: Ref ID 5c17c66*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

6 Volumes (1 Flex-Flash UN (item has green plastic/rubber backing) 1 felt covered plastic netting [?] (stord with Flex-Flash UN piece) 1 Flex-Flash F 1 Hydrodrain 302 1 Monolithic Membrane) : 6 samples contained in one manila envelope.

Language of Materials

From the Record Group: English

Physical Location

Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479