Samples - Roofing
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
6 Volumes (1 Flex-Flash UN (item has green plastic/rubber backing) 1 felt covered plastic netting [?] (stord with Flex-Flash UN piece) 1 Flex-Flash F 1 Hydrodrain 302 1 Monolithic Membrane) : 6 samples contained in one manila envelope.
Language of Materials
From the Record Group: English
Physical Location
Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository