Samples - Roofing

 Item — Container: Ref ID ab1d05e*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

2 Volumes (Two apparently unaffiliated samples. Related because they are of the same material but different forms. 1 "Dens Deck Prime" Pre-primed glass-mat gypsum board roof sample 1 "Dens Glass Gold" Type X glass mat gypsum sheeting sample) : 2 samples in plastic wrapping Notes attached to both samples: "Not on cross submittal list." [Same inscription for both samples.]

Language of Materials

From the Record Group: English

Physical Location

Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository