Sample - Metal Roof Panels
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 volume ((1 sample and 1 submittal document) Corrugated metal roofing sample submitted by SOM and accompanying product data documentation. 1 Shed Roof sample 1 Metal Roof Panels Bid Package 4 documentation, Section 07420) : Note attached to product documentation: "Sample is being cut smaller by Victor -Per 1/14/2004 request by Min" The above note explains the rough semi-sharp edge on the metal piece. Placed removable artist's tape along edge for safety precautions but take care to avoid edge when handling.
Language of Materials
From the Record Group: English
Physical Location
Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository