Skip to main content

Sample - Color

 Item — Container: Ref ID 1f3a29a*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 volume (C/S Group finishes demonstration panel sample for color and gloss with accompanying submittal transmittal submitted 20040106 1 560 Onyx Gray sample)

Language of Materials

From the Record Group: English

Physical Location

Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479