Sample - Color
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 volume (C/S Group finishes demonstration panel sample for color and gloss with accompanying submittal transmittal submitted 20040106 1 560 Onyx Gray sample)
Language of Materials
From the Record Group: English
Physical Location
Promenade, Suite M, Physical Items Shelving Unit 1, Shelf 3
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository