Sample - Ceramic Tiles
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
8 Volumes ((1 transmittal sheet, 7 samples) "Data and MSDS sheets" for ceramic tile 2 "J. Dean Ballard Keystone Mosaics - Trim" ceramic tile sample 1 "J. Dean Ballard Keystone Mosaics - C883Cove Base" ceramic tile sample 1 "J. Dean Ballard #0182 Suede Gray" ceramic tile sample 1 "J. Dean Ballard SN4449" ceramic tile sample (gray) 1 "J. Dean Ballard SN4449" ceramic tile sample (adobe) 1 "J. Dean Ballard White Carrara Marble" sample)
Language of Materials
From the Record Group: English
Physical Location
Promenade, Suite M, Physical Items Shelving Unit 2, Shelf 10
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository