Fuel Oil Systems Operations & Maintenance Training Manual, Central Plant & Potable Water Station

 File — Container: Ref ID 11fa7f6*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 volume

Language of Materials

From the Class: English

Physical Location

Promenade, Suite M, Shelving Unit 3, Shelf 5

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository