Commissioning Plan for Central Plant, Telecomm & Potable Water
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 volume (Table of contents: HVAC, Chilled Water, Condensor Water, Heating Hot Water, Steam, Underground Fuel Oil System (CP), Fuel Oil and Potable Water, Fire Suppression, Test, Adjust & Balance, Emergency Generator System, Site Power Electrical, Chiller Power System Testing, Ate Electrical Tests Report, Ate Electrical Test Report - Potable, Final Backflow Preventer Test Report, Water Laboratory Bacteria Testing, Fire Hydrant Inspection, Overhead Door Drop Test Certification. )
Language of Materials
From the Record Group: English
Physical Location
Castle Warehouse, Shelving Unit 4, Topshelf
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository