Skip to main content

Operations and Maintenance Manual, As-Built Drawings, Division 17 - Energy Management and Control System

 File — Container: Ref ID 3fd42a0*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 volume (Volume came with a CD - files were saved to UCMStor\Projects\SI\Closeout)

Language of Materials

From the Class: English

Physical Location

Promenade, Suite M, Shelving Unit 3, Shelf 5

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479