Electrical As Builts, Bid Package 3 & 6, ARUP, 2006-02-02

 Item — Container: Ref ID ad8e9a5*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2006-02-02

Extent

20 Sheets (Areas 102, 201-205, Diagrams) ; 36" x 48"

Language of Materials

From the Class: English

Physical Location

Castle Warehouse, Large Drawing Cubbies, Cubby 22

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479