BP 3 Record Documents, Document Control Set, Arup, 2002-09-13
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2002-09-13
Extent
50 Sheets (Site utilities, parking, landscape around buildings Extent is an approximation)
Language of Materials
From the Class: English
Physical Location
Castle Warehouse, Map Case 1, Drawer 8
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository