10_1 Newspaper Articles
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
From the Class: 15 Linear Feet
Language of Materials
From the Collection: English
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository