Skip to main content

Central Plant Architecture Awards, 2006-04 - 2007-05

 File — Container: Ref ID e488c9d*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2006-04 - 2007-05

Extent

1 folder (Honor Award for Excellence in Architectural Design for UC Merced Central Plant awarded to SOM and Arup, given by The American Institute of Architects, dated May 2007 Excellence in Architecture Honor Award for UC Merced Central Plant awarded to Arup and SOM, given by The American Institute of Architects San Francisco Chapter, dated April 2006)

Language of Materials

From the Collection: English

Physical Location

Promenade, Suite C, Archives Cabinet 3, Drawer 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479