Campus 2008 Site Development and Infrastructure Design, Bid Package 3, Addendum 1, 2003-03-12
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2003-03-12
Extent
1 volume ; Half size set
Language of Materials
From the Record Group: English
Physical Location
Castle Warehouse, Map Case 1, Drawer 8
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository