Skip to main content

(Site 2) Landscaping As-Builts/Redlines Bid Package L , 2005-07-06

 Item — Container: Ref ID ac8aeb7*

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2005-07-06

Extent

1 volume

Language of Materials

From the Class: English

Physical Location

Castle Warehouse, Large Drawing Cubbies, Cubby 22

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479