Detailed Project Program, Final Report, Arup, 2001-04
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2001-04
Extent
1 volume (2 copies; one copy is being stored with the Design and Construction files at the Castle Warehouse and one copy is being stored in the Chancellor's Archive Room at the Castle Warehouse)
Language of Materials
From the Class: English
Physical Location
Castle Warehouse, Cabinet 1, Topshelf
Physical Location
Castle Warehouse, Chancellor's Archive Room
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository