SWPPP - BMP (Best Management Practices), ACME, 2007-07-02
Scope and Contents
The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility will be located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock. The project is scheduled to be completed in time for Fall 2008.
The Logistical Support/Service Facilities project is designed to contain 18,128 assignable square feet within a total area of about 20,660 gross square feet for campus facilities management and environment, health and safety (EHS) functions. The EHS laboratory and waste function was accommodated within a portion of the State-funded Science and Engineering Building when occupied. The smaller LSSF program is a response to the program modification and to budget constraints. The remaining LSSF program elements and functions are accommodated within the current project. The facility is located on a site near the campus central plant. The project consists of office, warehouse/multipurpose, shop, and hazardous materials storage space for Facilities Management and Environment, Health and Safety. The project includes three metal clad buildings on the same site segregating functions, and sharing a loading dock.
Dates
- Creation: 2007-07-02
Extent
1 volume (Initial SWPPP Certification Owner Developer Approval and Certification of the Storm Water SWPPP Amendment Certification and Approval Amendment Log Introduction and Project Description Unique Site Features Construction Site Estimates Project Schedule/Water Pollution Control Schedule Contact Information/List of Responsible Parties Objectives Vicinity Map Pollutant Source Identification and BMP Selection Inventory of Materials and Activities that May Pollute Storm Water Existing (pre-contstruction) Control Measures Nature of Fill Material and Existing Data Describing the Soil Erosion Control Sediment Control Wind Erosion Control Non-Storm Water Controls Waste Management and Materials Pollution Control Water Pollution Control Drawings (WPCDs) Construction BMP Maintenance, Inspection, and Repair Post-Construction Storm Water Management Post Construction Control Practices Operation/Maintenance after Project Completion Training List of Subcontractors Other Plans/Permits SWPPP Preparer Acme Construction Company Patricia Wong - Safety/SWPPP Coordinator 1565 Cummins Dr. Modestco,CA 95358 209-523-2674 Site Inspections Non-Compliance Reporting Record Keeping and Reports Sampling and Analysis Plan for Sediment Scope of Monitoring Activities Monitoring Strategy Monitoring Preparation Analytical Constituents Sample Collection and Handling Sample Analysis Quality Assurance/Quality Control Data Management and Reporting Data Evaluation Change of Conditions )
Language of Materials
From the Collection: English
Location
Castle Warehouse, Cabinet 13, Drawer 1
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository