Existing Grades , 2013-12-13

 Item — Container: Ref ID ref112_7rp

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2013-12-13

Extent

3.3 Linear Feet (3002.04 Existing Grades (7 copies) LITC IT Plan Layout Drawings)

Language of Materials

From the Record Group: English

Location

Castle Warehouse Cabinet 7, Drawer 4

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository