Project Closeout Binders
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
7 Volumes (Prime Trade Contract "G" Site Concrete West, Jos. Albanese Prime Trade Contract "F" AC Paving East, Granite Construction Prime Trade Contract "E" AC Paving West, George Reed Prime Trade Contract "D" Site Utilities, Granite Construction Prime Trade Contract "C" - Site Electrical East, Collins Electric Prime Trade Contract "B" Site Electrical West, Rex Moore Electric Prime Trade Contract "A" Earthwork, Granite Construction )
Language of Materials
From the Class: English
Location
Castle Warehouse, Large Shelf, B 6
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository