Skip to main content

Operations and Maintenance Manual, Rex Moore, Site Electrical West

 File — Container: Ref ID ref194_lje

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 volume (16121 Medium Voltage Cable 16271 Pad Mount Transformers 16291 Metering 16442 Panelboards 16520 Lighting 17053 Lighting Control Panels 16010 Testing Training Agenda)

Language of Materials

From the Class: English

Location

Castle Warehouse, Cabinet 1, Topshelf

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479