Large Drawing (see container summary), 2003-09-03
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2003-09-03
Extent
1 volume (Submittal Package BP4-05120-0004-0, Structural Steel Shop Drawings, Beams & Misc Details 9/3/2003 Stamped information (including the stamped date) and whether or not there is a signature or original markings on the documents. )
Language of Materials
From the Record Group: English