Large Drawing (see container summary), 2003-09-03

 Item — Container: Ref ID ref26_wxo

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2003-09-03

Extent

1 volume (Submittal Package BP4-05120-0004-0, Structural Steel Shop Drawings, Beams & Misc Details 9/3/2003 Stamped information (including the stamped date) and whether or not there is a signature or original markings on the documents. )

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Drawing Bays

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479