Bid Package 3 & 4 Submittals
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 box (Correction Notice, BP3 Daily Reports, BP3 13205 Testing, BP3 15260, BP4 Gas Main Pressure Test Air Testing for Sewer Pipe 02300, BP3 02550, BP3 02555, BP3 03200, BP3 03300, BP3, Paint Submittal 13200, BP3 PWPS Tank 1 large file of correspondence/notes)
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Large Shelf, T 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository