Skip to main content

Bid Package 3 & 4 Submittals

 File — Container: Ref ID ref307_jic

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 box (Correction Notice, BP3 Daily Reports, BP3 13205 Testing, BP3 15260, BP4 Gas Main Pressure Test Air Testing for Sewer Pipe 02300, BP3 02550, BP3 02555, BP3 03200, BP3 03300, BP3, Paint Submittal 13200, BP3 PWPS Tank 1 large file of correspondence/notes)

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Large Shelf, T 2

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479