Skip to main content

Submittals 16291 - 17058, 2004

 File — Container: Ref ID ref33_ctv

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2004

Extent

3.3 Linear Feet (Inventory: 16291: Electricity Metering Wiring Diagrams for Connection of Data Collection System 16332: Vacuum Interupter Switches Drawings 16345: Medium Voltage Circuit Breaker Kwitchgear 16411: Disconnect Switches Outline Drawings 16413: Automatic Transfer Switches Data 16420: Motor Starters Data 16441: Switchboards Drawings 16442: Panelboards Drawings 16450: Busway Drawings 16461: Dry Type Transformers Data 16510: Interior Luminaries Drawings 16530: UL Listing and Factory Test Reports 16572: Low Voltage Switches 16573: Occupancy Sensore Switches Data 16620: Network Equipment Data 16620-0002: Central Plant Fire Alarm Data & Drawings 16744: Rigid Steel Conduit Data 16746: Copper Cabing Data for Telephone 16748: Wall Mounted IDF and Telephone Encosure Data 17052: EMCS Operator Interfaces 17053: EMCS Field Panels 17053: EMCS Communications Devices 17054: EMCS Field Panels Sbmittal Package 1 17058 EMCS Points and Sequence of Operations)

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Cabinet 4, Drawer 4

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479