Skip to main content

Submittal 15064 / 15300-6, Fire Sprinkler Working Drawings Resubmittal, 2005-09-14

 File — Container: Ref ID ref181_k9h

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2005-09-14

Extent

1 volume

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Cabinet 17, Topshelf

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479