Skip to main content

BP4 Submittals 09960 through 15490, 2004

 File — Container: Ref ID ref29_rx1

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2004

Extent

3.3 Linear Feet (Inventory: 09960: Protective coatings schedule of materials 09900: Painting data 10170: Plastic Toilet Compartments Data 10210: Metal Louvers 12" square Fluoropolymer Finish 10445: Graphics Schedule 10500: Lockers 12" sq. sample 10522: Fire Extinguisher Data 10810: Toilet Accessories 6" square Corner Section of Framed Mirror (no content; folder removed) 11260: Disinfection & VOC Testing Disinfection Plan... (no content; folder removed) 11451: Residential Appliances GE Refrigerator 12481: KD98 Walk Off Mat 12495: Mecho Shade Cloth Color/Product Data 13118: Corrosion Monitoring System List of Equipment and Materials 13200: PWST Exterior Color Sample 13205: Thermal Energy Storage Tank Orientation & Elevations (two folders) 13701: Security General Requirements Shop Drawings (no content; folder removed) 15060: Pressure Pipe Black Steel Joints w/Threaded Joints Pipe and Fittings 15100: Gate Valves Product Data and Shop Drawings for 2" and Smaller 15140: Piping Supports, Guides, Hangers, and Anchors Design and Calculations 15140-003: Steam and Steam Condensate Piping Specialties 15170: Motors Data 15182-0006: X-Ray of Welds of Seam and Steam Condensate Pipe 15184: Steam Traps Data 15190: Manufacture's Identification Data and Shop Drawings 15240: Anchorage and Bracing Calculations for Equipment 15260: Glass Fiber Insulation Data 15280: Equipment Insulation Data 15290: Fiber Glass and Acoustic Insulation Data 15490: Fuel Oil System Detailed Plan View)

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Cabinet 4, Drawer 2

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479