BP2 Submittals 10050 through 16500, 2013-05-03

 File — Container: Ref ID ref12_yua

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: 2013-05-03

Extent

3.3 Linear Feet (File Inventory: 10050 Building Specialties 10400 Identifying Devices 15000 Mechanical 15050 Exposed Piping, Values (two large hanging folders) 15250 Steam & Steam Condensate Piping Mounts 15330 Fire Extinghisher Systems 15800 Ventilating & Air Conditioning 16070 Supporting Devices 16075 Electrical Identification 16120 Low Voltage Wire & Cable 16131 Conduit 16132 Boxes 16140 Wiring Devices for Utility Tunnel 16235 AFD for Utility Tunnel 16290 Control Devices for Ventilation & Lighting 16405 Underground Electrical Date for Accessories 16440 Panelboard for Utility Tunnel 16500 Lighting for Utility Tunnel)

Language of Materials

From the Record Group: English

Location

Castle Warehouse, File Cabinet 3, Drawer 2

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository