BP2 Submittals 01113 through 08310
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
3.3 Linear Feet (File Inventory: Road Survey from Swinterton 01110 Summary of work 01113 Special Requirements 01120 Leed Certification 01329 Contract Schedules 01664 Training 01830 Closeout 02220 Site Demolition 02300 Earthwork 02511 Potable and Recycled Water 02580 Communication Structures 02730 Aggregate Surfacing 03000 PreCast Concrete 03210 Reinforcing Steel for Utility Tunnel 03300 Cast-in-Place Concrete 08700 Finish Hardware for Utility Tunnel 05120 Structural Metal Framing 07130 Modified Bituminous sheet 07900 Joint Sealants for Tunnel 08100 Hollow Metal Work 08310 Access Door for Utility Tunnel 01568 Tree and plant protection)
Language of Materials
From the Record Group: English
Location
Castle Warehouse, File Cabinet 3, Drawer 1
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository