Bid Package 4 Submittals and Miscellaneous (Chiller & TES Tank)
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 box (MEP Meeting Minutes Site DFR Conco Geotech Report, Proposed Corporation Yard, 9/8/2003 BP4 02200 Earthwork BP4 02550 BP4 02550 Chilled Water 03200 Submittals BP4 03200 Reine Steel 03300 1.04 QA 03300 1.06 Submittals BP4 03300 2.01 Materials Submittals BP4 05120 1.03 Quality Control BP4 05120 1.04 Welder Qualifications BP4 05120 1.06 Submittals BP4 05120 Shop Welding Reports QA/QC BP4 05300 1.04 QA BP4 05300 1.06 Submittals BP4 07140 1.03 Submittal BP4 07140 Water Proofing BP4 07210 Submittal BP4 07481 BP4 07565 BP4 07812 BP4 07840 Firestopping BP4 09250 INterior Gypsum Substitute BP4 09250 Interior Meta Framing & Misc. Field Info BP4 09250 Screen Wall BP4 13205 Welding BP4 13205 TES Tank Repair data BP4 13205 TES Tank Design Structural BP4 13205 TES Tank Design Geotechnical BP4 13205 TES Tank Pile Submittals BP4 13205 TES Tank Pile Installation BP4 15060 ACCO WPS & Certifications BP4 15060 Quantum WPS & Certifications BP4 15140 Schedule "A" [large file] )
Language of Materials
From the Record Group: English
Location
Castle Warehouse, South Drawing Bay, Large Shelf, B 7
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository