Skip to main content

Tests (materials, steel, welding), Meeting Minutes, RFIs, Submittals

 File — Container: Ref ID ref234_ew2

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 box (Construction Testing Services Extra Work Orders for Additional Testing and Inspection Services Welding and Steel Reports Field Orders, BP 3, Bulletins Requests for Information Submittal BP 5/6 02200, CAI Comp. Testing BP7 Soils - Geotechnical Report SD + I Field Daily Narratives BP4 DFRs: SD+I Structural Steel, Central Plant BP4 15300 BP4 15400 Submittals BP4 15490 Fuel Cell BP4 16121 Medium Voltage Cable )

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Large Shelf, T 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479