Specifications, Bidding and Construction Documents, Parking Lots A, B & C, 2003 - 2005
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2003 - 2005
Extent
4 Volumes (Specifications, BP 5, 6 & 7, Parking Lots A, B & C, 12/15/2004 Spec Section 02740, Flexible Pavement Spec Section 17050, Energy Management and Control System, General Spec Section 02220A Demolition for Utilities 100% Construction Documents, 11/5/2003 Memo, BP 7, Addendum no. 2 Loose leaf document registries Bid Form, Excavation, grading, underground utilities, site drainage, concrete, bridge railing, flexible pavement 7 striping, site electrical )
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Cabinet 28, Drawer 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository