Change Orders, Contract Documents, Addenda, NTP, Swinerton Builders
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 box (Change Orders 21 thru 27 Change Orders 16 thru 20 Change Orders 9 thru 15 Change Orders 1 thru 8 Contract Documents, Divisions 1 thru 16 Addenda 1 thru part 3 NTP/Bonds/Addenda 3 thru 9)
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Large Shelf, B 12
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository