Central Plant & Telecom Submittals (see container summary), 2014-03-27
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2014-03-27
Extent
1 volume (Miscellaneous correspondence Spec #02750 Spec #03400 Spec #03330 Spec #04200 Spec #06411 Spec #07410 Spec #07420 Spec #07481 Spec #07600 Spec #08101 Spec #08520 Spec #08801 Spec #09300 Spec #09510 Spec #09550 Spec #09651 Spec #09690 Spec #09900)
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Cabinet 4, Drawer 4
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository