Fire Sprinkler Submittal (15330/15365/07840)
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
2 Volumes (Three volumes: Pump Station Central Plant & Telecommunications Building Hydraulic Calculations)
Language of Materials
From the Record Group: English
Location
Castle Warehouse, Cabinet 5, Topshelf
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository