Skip to main content

Part 2, Construction Administration Miscellaneous (see container summary)

 File — Container: Ref ID ref188_ra6

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

1 box (Binder summary: Field Orders IOR Daily Reports Kleinfelder PSA Correspondence Correspondence (LITC, COB, SE, SI, H1-GSLD) Executed Change Orders (without backup) RFIs (2 binders))

Language of Materials

From the Record Group: English

Location

Castle Warehouse, Large Shelf, T 15

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479