Construction Administration
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
3.3 Linear Feet (5Q Inspection Reports IOR 5R.1 Field Reports. Mech. Insp. (Empty) 5R.2 Field Reports: Elec. Insp (Empty) 5R.3 Field Reports: Design Professional Consultant 5R.4 Field Reports: Campus Agencies 5R.5 Project Report 5S Archeology Issues (Empty) 5T Insurance (empty) 5T.1 Builders Risk Policy 5U Project Meeting Minutes (4 Hanging Folders) 5V.1 Subcontractor Substitiution (Empty) 5U.3 Other Construction Related Meetings 5U.2 Disupute Review Board (Empty) 5U.1 Partnering Meeting (Empty) 5V Subcontractors List 5W Submittal Log 5X Permits 5X.1 Testing Reports: Concrete (4 Hanging Folders) 5X.2 Test Reports: Soils (2 Hanging Folders) 5X.3 Test Reports: Welding 5X.4 Test Reports: Miscleaneous 5X.5 Waste Management Reports 5x.6 LEED Construction 5X.7 Public Reports 5X.8 SWPP 5X.8 Binder NPDES 5Y Cost Estimates (Empty) 5Z Transition to Site Schedules (Empty) 5Z Transition to Site ( Empty) 6A Project Completion 6B Operations Manuals 6B.1 Training Binders (Empty) 6A.1 Punch Lists 6B.2 Commissioning 6D.1 Certificate of Completion 6D Certificate of Occupancies 6D.2 Release of Retention )
Language of Materials
From the Record Group: English
Location
Castle Warehouse Cabinet 5, Drawer 4
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository