Skip to main content

Construction Administration

 File — Container: Ref ID ref89_r8d

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

3.3 Linear Feet (5G Potential Change Order (2 Hanging Folders) 5H Letters of Instruction 5I Request for Information (Continues to hanging folder 156-1) 5J Construction Schedules 5J.1 Construction Schedules 5J.2 Construction Schedules (Empty) 5J.2 Construction Schedules (weekly/look ahead) 5.0 Correspondence Contractor 5O Correspondence Contractor Pump Issues 5.0 Correspondence Contractor. Boiler Issue 5O Correspondence Diebold 5P Notice of Non Compliance 5O McCarthy Transmittals 5P.1 Superintendent Daily Reports (Empty) 5P.2 Final Certifications: Building Pad/Trench 5P.3 Final Certifications: building PAD 5P.4 Final Certifications: Building Geotechnical Investigation Report 5P.5 Final Certification: Fire Sprinkler (Empty) 5P.6 Final Certification: Air Balance/Air Flow (Empty) 5P.7 Final Certification: Water Flow, Water Purification 5P.8 Final Certification: Metal Fabrication/ Steel Fabrication (empty) 5P.9 Final Certification: Wood Truss Fabrication (Empty) 5P.10 Final Certification: Elevator Inspector Certification (Empty) 5P.11 Final Certification: Gases/Natural 5P.12 Final Certification: Mechanical Certifcications 5P.13 Final Certification: Structural Engineering (Empty) 5Q.1 Summary Inspection Reports IOR 5Q.2 Inspection Reports: IOR Correction Notices 5Q.1 Summary Inspection Reports: IOR 5P.3 Geotechnical Investigation Report)

Language of Materials

From the Record Group: English

Location

Castle Warehouse Cabinet 5, Drawer 3

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479