Misc Shop Drawings

 Item — Container: Ref ID ref18_wt2

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]

Dates

  • Creation: Between 2002 and 2006

Extent

3.3 Linear Feet (Drawings: 16620-0002-1, BP4, Fire Alarm System (9 sheets) 05120-0012-0, BP4, Structural Steel 07410-0001-0, BP4, Metal Wall Panels 03200-0001-0, BP4, Concrete Reinforcement 05120-0002-0, BP4, Structural Steel Erection drawings & partial columns 05120-0002-0, Structural Steel 05120-0001-0, BP4, Structural Steel 16620, BP4, Fire Alarm System BP4, 05120-0001-0 Structural Steel (anchor bolts & embeds) BP4, 03100-0003-0, Concrete Formwork BP4, 08801-0001-0, Type 2 & Type 3 Glass BP4, 05300-0001, Metal Decking BP4, 10210, Metal Louvres 0512-0003-0, Structural Steel BP4, 15010-0018-2, Basic Mechanical Requirements BP4, 05500-0002-0, Fabrications BP4, 15060-0006-0, Pipe Fittings BP4, 15365-0002-0, Fire Supression System BP4, 07140-0001-1, Fluid Applied Waterproofing BP4, 05120-0001, Structural Steel BP4, 05120-0008, Structural Steel )

Language of Materials

From the Record Group: English

Location

Castle Warehouse, File Cabinet 4, Topshelf

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository