Shop Drawings, 2013-04-22
Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2013-04-22
Extent
3.3 Linear Feet (BP2 15330-0002-0 Fire Extinguishing Systems for Utility Tunnel 03210-002 Reinforcing Steel for Tunnel BP2 03210-0002-1 Reinforcing Steel for Tunnel BP2 15800-0002-1 Ventilating & Air Conditioning for Utility Tunnel BP2 03210-0003 Reinforcing Steel for Tunnel BP2 03210-0001-001 Reinforcing Steel for Tunnel BP2 03210-0003 Reinforcing Steel for Tunnel BP2 03210-0002-2 Reinforcing Steel for Tunnel BP2 15050-0010-0 Exposed Piping, Valves & Accessories for Utility Tunnel BP2 03210-0002-2 Reinforcing Steel for Tunnel BP2 03210-0002-001 Reinforcing Steel for Tunnel Acco engineered systems - Lower level plan pipe w/ hangers, Area A [folded] Pacific Erectors, Inc, TES-E1 Tes Tank submittal [folded] BP2 15330-0002-0, Fire Extinghising Systems BP4 08801-0002-0, Miscellaneous Glazing BP4 05120-0010-1, Structural Steel BP2 05500-002-001, Miscellaneous Metals 16070-001-001, Supporting Devices BP2 05500-0002-2, Metal Fabs for Utility, Miscellaneous Metals BP2 15250-0002-1, Steam & Steam Conclensate Piping BP2 15050-0011-3, Exposed piping, valves & accessories for utility tunnel 05120, Structural Metal Framing for Tunnel BP3 05310-0001-0, Structural Metal Framing BP4 03100-0002, Concrete Form work BP3 07410-0001-0, Preformed Metal Roofing & Siding Landscape Piping Plan, 4/27/2005 [no other detailed documentation included] )
Language of Materials
From the Record Group: English
Digitized and saved to ucmstor
The following shop drawings have been digitized and saved to ucmstor under the location
\\ucmstor\PPDC\Projects\Site and Infrastructure Phase 1\6_Construction Administration\Communications\Submittal Packages\Shop Drawings
BP2 15330-0002-0 Fire Extinguishing Systems for Utility Tunnel
03210-002 Reinforcing Steel for Tunnel
BP2 03210-0002-1 Reinforcing Steel for Tunnel
Location
Castle Warehouse, File Cabinet 3, Topshelf
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository