Scope and Contents
The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: 2013-11-08
Extent
3.3 Linear Feet (4A.6 Bid Summary & Docs Award (6 of 8) (Empty) 4A.7 Bid Summary & Docs Closeout (7 of 8) (Empty) 4A.8 Bid Summary & Docs Specifications (8 of 8) (Empty) 4A.3 Bid Summary & Docs Pre-Bid (3 of 8) (Empty) 4A.2 Bid Summary & Docs (2 of 8) (Empty) 4A.1 Bid Summary & Docs (1 of 8) (Empty) 4A.8 Bid Summary & Docs Specifications (8 of 8) 4B.1 Prequalification Documents Correspondence (1 of 5) 4B.1 Prequalification Documents Correspondence (1 of 5) (Empty) 4B.2 Prequalification Documents Masters (2 of 5) 4B.3 Prequalification Conference (3 of 5) 4B.4 Prequalification Adendum (4 of 5) 4A.1 Bid SUmmary & Docs (1 of 8) BP 1 Demolition 4A.2 Bid Summary & Docs (2 of 8) BP 1 Demolition 4A.6 Bid Summary & Docs Award (6 of 8) BP 1 Demolition 4A.8 Bis Summary & Docs Specifications (8 of 8) BP 1 Demolition 4A.6 Bid Summary & Docs Award (6 of 8) BP2 4A.8 Bid Summary & Docs Specifications (8 of 8) BP2 4A.8 Bid Summary & Docs Specificaionts (8 of 8) 4B.5 Prequalification Submittals (5 of 5) 4A.6 Bid Summary & Docs Award (6 of 8) BP 2.1 Temp Servicees 4A.6 Bid Summary & Docs Award (6 of 8) BP 4.1 Telecom, Pump House, CUP 4A.6 Bid Summary & Docs Award (6 of 8) BP 4.2 Telecom, Pump House, CUP 4A.8 Bid Summary & Docs Specifications (8 of 8) BP 3.1 Site Work 4A.8 Bid Summary & Docs Specifications (8 of 8) BP 4.1 Telecom, Pump House, CUP 4A.5 Bid Summary & Docs Bid (5 of 8) BP 4.3 Telecom, Pump House , CUP 4A.1 Bid Summary & Docs (1 of 8) BP 4.4 Telecom, Pump House, CUP 4A.6 Bid Summary & Docs Award (6 of 8) BP 4.5 Telecom, Pump House, CUP 4A.5 Bid Summary & Docs Bids (5 of 8) BP 6.1 Paving, Landscape 4A.6 Bid Summary & Docs Award (6 of 8) BP 7 Corp. Yard Bldg. 4B.1 Prequalification Documents Correspondence/General (1 of 5) Bp 4.5 Telecom, Pump House, CUP 4B.5 Level I Prequalification Analysis 5A Asbestos 5B Certified Payroll 5B Certified Payroll BP 1 Demolition 5B Certified Payroll (11folders) 5C Field Orders (Extends through next three folders ending on 51-1) 5D Change Order Request 5E Change Orders Denied/Cancelled 5F Change Order Numerical 5F.1 Settlement & Release of Certain claim 5G Potential Change Order Requests change )
Language of Materials
From the Record Group: English
Location
Castle Warehouse Cabinet 5, Drawer 2
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository