Prequalification Level 2 Responses, 2002-11

 File — Container: Ref ID ref69_0bz

Scope and Contents

From the Collection:

The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street... paving. [Completed in 2005]

See more

Dates

  • Creation: 2002-11

Extent

5 Volumes (Inventory: Bovis Land Lease, Hensel Phelps Construction Co., Webcor, Gilbane Building Co. )

Language of Materials

From the Record Group: English

Collapse All

Location

Castle Warehouse, Cabinet 5, Topshelf

Repository Details

Part of the University of California, Merced, Design and Construction Archives Repository

Contact:
5200 North Lake Road
Merced 95343 USA US
(209) 228-4479