The campus multi-phase site development and infrastructure strategy includes: Phase 1 - site clearance, rough grading, and underground utility work plus construction of the central utility plant. [Completed in 2005]. Phase 2 - completion of the central utility plant, installation of a thermal energy storage tank and street paving. [Completed in 2005] Phase 3 - site finishes, such as pedestrian paving, landscaping, lighting and a portion of street paving. [Completed in 2005]
Dates
- Creation: Between 2002 and 2006
Extent
1 box (Bid Package 4, 9/27/2002, Fire Marshal & DSA stamp/signed Bid Package 4.5 100% Construction Documents, 9/1/2004 Bid Package 7 100% Design Development, 8/22/2003 Bid Package 5, 1/24/2003 Bid Package 7, Schematic Design, 4/11/2003 Bid Package 5, 1/24/2003 Bid Package 6, 100% Construction Documents, 10/3/2003 Bid Package 4, Section 02080 Precast Concrete Sectional Manholes Bid Package 7, Schematic Design, 4/11/2003 Bid Package 6, 50% Construction Documents, 5/2/2003 Bid Package 3, 9/13/2002 Phase 1 Contract 2, Bid Specifications, Volume 1 )
Language of Materials
From the Record Group: English
Location
Castle Warehouse, South Drawing Bay, Large Shelf, B 5 & 4
Repository Details
Part of the University of California, Merced, Design and Construction Archives Repository